Cross-Border Supply Contracts: Delivery, Acceptance, and Warranty

A delivery receipt, an acceptance certificate, and a warranty address three different events. A supply contract can give each its own legal consequences, particularly where a defect becomes visible only after installation.

Link payment to the test the buyer can actually perform

A warehouse team can count boxes and record visible damage. It may take a trial run at the buyer’s plant to confirm output, power consumption, or compatibility with an existing line. If a receipt signed at the dock triggers final acceptance, a buyer can lose meaningful payment leverage before that trial takes place. The supplier also needs protection from an open-ended acceptance process driven by a site that is unready. Allocate payment milestones to identifiable events, specify operating conditions and the method of measuring performance, and explain who bears delay when a prerequisite for testing is missing. A right to retest is worth little without an agreed schedule and a record that both parties can review.

Suppose an installation test misses the agreed output figure. The buyer can notify the supplier promptly of that specific shortfall even while the teams investigate whether the cause lies in the inputs, the installation, or the equipment. A shared test record gives both sides a basis for selecting a remedy and for determining whether payment has become due.

Build a path from discovery to notice

Where the CISG governs and the parties have not varied its rules, Article 35 addresses conformity and Article 36 addresses the timing of a seller’s responsibility for nonconformity, including later nonconformity attributable to the seller’s breach of an obligation, such as an agreed guarantee. Article 38 calls for examination as soon as practicable in the circumstances and can permit deferral until arrival where the contract involves carriage. Under Article 39, the buyer generally must notify the seller, specifying the nature of the nonconformity, within a reasonable time after actual or constructive discovery. There is also a two-year outer limit from actual handover, subject to qualifications, including incompatibility with a contractual guarantee period. Article 40 prevents the seller from relying on Articles 38 and 39 in specified cases involving facts it knew or could not have been unaware of and failed to disclose.

The notice should identify the affected shipment and explain what is wrong in terms the supplier can investigate. A prompt message reporting the failing test, serial numbers, and observed output is more useful than waiting for a full root-cause report. Designate who receives notices and how supporting records may follow. Record the difference between the initial report and the technical investigation so neither party confuses the timing of one with the timing of the other.

Agree on the next step before a defect occurs

Warranty provisions work best when they say what constitutes a covered defect and what the supplier has to do about it. Repair may be commercially sensible if a timely retest is possible. A recurring defect may require a replacement or a negotiated refund mechanism. Identify the circumstances in which the buyer can move to the next remedy, who arranges removal and return freight, and how the warranty applies to replacement units. A purchase-side review should trace the path from a delivery receipt through performance testing, notice, and cure. If any event ends the buyer’s rights or triggers payment, the contract should make that consequence visible to the people signing the document.

Sources