A manufacturing agreement should address what the buyer needs to order conforming goods today and what it would need to resume production elsewhere tomorrow. Those questions reach the specifications, the physical tooling, and the rights to use the design.
Turn approval into a reproducible specification
OEM and ODM labels are commercially useful shorthand, but the contract needs to specify who controls the design and who approves changes. A comparison against an approved sample may identify a cosmetic issue without explaining whether a substitute material is permitted. Use a dated specification and a defined testing method. State which document controls when a drawing and the sample differ, and which changes in inputs, subcontractors, or production sites require approval. The parties should be able to identify the version that governed an individual batch. Under CISG Article 3, custom manufacture may be treated as a sale, subject to the substantial-materials and predominant-services rules. If the Convention applies, its conformity rules should be read with the specifications.
Establish access to the tooling
A tooling charge leaves several operational questions. When does title pass, who has physical custody, and when can the buyer collect the tool? Identify the mold or fixture and its location, specify permissible uses, and assign maintenance and return costs. A promise from the contracting factory may be difficult to implement if an independent subcontractor holds the mold. Address the subcontractor’s custody and cooperation before the tool is installed. For assets intended to be transferable, agree what condition and accompanying records are necessary for a receiving factory to put them back into service.
A transfer package is easier to specify while the original line is running. The buyer can compare the approved drawing to the editable file, check whether setup data for the tool are included, and identify anything the factory treats as preexisting. If a replacement plant needs to see a restricted file, the license and confidentiality terms should permit that particular disclosure.
Specify the rights and materials needed for continuity
Separate buyer-provided materials, the factory’s preexisting technology, and newly created product-specific designs. For copyrightable material under U.S. law, ownership of a physical item and copyright ownership are distinct. An assignment of copyright generally requires a writing signed by the rights owner or an authorized agent. Commissioning work and paying for it does not automatically establish U.S. work-made-for-hire status. Check who owns the rights and who has signed before relying on a transfer.
Full ownership of a factory’s processes may be unnecessary and commercially unavailable. For a buyer that needs a replacement manufacturing option, the more targeted negotiation may be a right to use the product-specific files and to authorize a substitute producer to use defined embedded technology. Make the permission match the data that will be handed over. A license to use an editable design has limited value if the contract requires delivery of only a locked viewing copy. Before signing, ask what the replacement factory would need to make the first compliant unit. That exercise can identify missing rights and missing files while the parties still have time to price them.
Sources
- CISG 제3·4·35조 | 주문제작, 적용 범위 및 적합성
- https://lois-laws.justice.gc.ca/eng/acts/I-20.4/FullText.html
- 17 U.S.C. §§101, 201, 202, 204 | 업무상 저작물, 최초 귀속, 현물과 저작권, 서면 이전
- https://www.govinfo.gov/content/pkg/USCODE-2024-title17/html/USCODE-2024-title17.htm