Overseas Technology Transfers and Korea’s Industrial Technology Protection Rules

A cross-border technology transaction may disclose sensitive information before the definitive agreement is signed. Identify the material, recipient and proposed access before determining whether Korean approval or reporting requirements apply.

Find the moment when the technology will be disclosed

A Korean company negotiating a joint venture or license may be asked to provide technical materials during diligence. A partner might also request access to a shared repository or a demonstration to evaluate whether a proposed process works. The useful starting point is the content that will actually be available. A performance overview and detailed process specifications can disclose very different information even when both are part of the same project.

Map the materials to the current technology designations and ask who will be able to see them and at what stage. A broad description such as “manufacturing know-how” may not be specific enough to make that determination. Bring the engineers into the review so they can distinguish a description of a product from information that shows how it is made. If classification remains uncertain, consider the applicable determination procedure and hold the relevant disclosure until it is resolved.

The source of development funding matters for National Core Technology

Article 11 of Korea’s Industrial Technology Protection Act generally requires advance approval when a covered institution seeks to export National Core Technology developed with government research and development funding to a foreign enterprise or another covered recipient. For National Core Technology outside that approval category, a covered institution generally must report in advance. The filing is subject to review and acceptance. A receipt should not be treated as confirmation that the transfer may proceed.

Tie the funding inquiry to the technology that will be transferred. A company may have received public funding for one project and developed other capabilities independently. Determine what the funded project covered and whether the knowledge or processes involved in the deal were developed with that funding. This inquiry can affect timing and the procedure that the parties must build into their deal.

Check the separate strategic-technology regime

Article 12 of Korea’s National High-Tech Strategic Industries Act requires approval for covered exports of designated strategic technology, including certain submissions of related information to foreign governments. This regime has its own legal basis and should be assessed separately from strategic-item licensing under the Foreign Trade Act. If multiple regimes apply, check how the requirements interact, including whether the relevant law treats an approval as satisfying another permission in the circumstances at hand.

The agreement can make technical disclosure conditional on the required approval or acceptance. If the buyer only needs to assess production capacity, consider whether a non-sensitive test result establishes the point without revealing the process itself. If the diligence requires the actual process, defer access until the legal requirements have been resolved. A nondisclosure agreement governs the use of information after disclosure. It does not authorize a disclosure that requires regulatory clearance. Specify which materials may be provided during diligence and which require further clearance. If the recipient or the material changes between approval and disclosure, revisit the assessment before opening access.

Sources

Call us