Changing Employers or Adding a Workplace Under Korean Immigration Law

Korean immigration law generally requires advance permission before a worker covered by the workplace rules changes or adds a workplace within the existing status. An eligible group of professional workers may instead report the change or addition within 15 days after it occurs. Work outside the scope of the current status raises a separate authorization question.

Compare the new work with the current authorization

Begin with the worker’s current classification, permitted activities and designated workplace. A move to a new employer to perform work within the authorized activity can raise a workplace-change issue. A second engagement within that scope can raise a workplace-addition issue. A transfer within a corporate group can also warrant review if the legal employer or location of work changes. Compare the proposed arrangement with what the existing authorization actually covers.

If the principal activity in the new position falls under a different status, changing the workplace alone does not resolve the immigration issue. The worker should assess a change of status before beginning the new activity. If the worker will keep the original activity and engage in a second activity outside the scope of the current status, consider whether permission for outside activities is required.

Identify who can use post-change reporting

Article 21 of the Immigration Act sets advance permission as the default within the scope of an existing status. Article 26-2 of the Enforcement Decree identifies the group that can use the reporting route: people within the E-1 through E-7 classifications who meet the criteria prescribed by Ministry of Justice notice. An eligible person must report within 15 days after the workplace changes or is added. A worker should not assume that an E-7 designation alone places every transfer within that exception.

When advance permission applies, a pending application does not authorize work for the new employer. The Act also restricts hiring a worker who lacks the required workplace-change or workplace-addition permission. The employer and employee should tie the actual start of duties to approval. When reporting is available, record the date on which the change or addition actually occurs and calendar the reporting deadline. In both cases, document what the new employer expects the worker to do and at which workplace.

Coordinate the departure and arrival dates

The last day with the old employer, the first day with the new one and the expiration of authorized stay can be three different dates. Consider the immigration effect of a gap between the jobs before setting a resignation date. A workplace procedure does not automatically extend the period of stay, so a nearby expiration date needs separate attention.

A sound approach is to obtain the proposed contract and concrete duty description from the new employer while there is still time to establish the correct procedure. If the classification is unclear, allow for the possibility that permission will be needed before work begins. If terms change during negotiation, check whether the planned procedure still fits. That matters particularly where a second job looks similar on paper but involves materially different duties, or where an internal transfer places the employee with a separate legal entity.

If the new employer assumes every E-7 change can be reported after the move, ask what makes this particular change eligible. When the new duties fall outside the approved activity, first assess what authorization those duties require. A proposed start date should leave time to resolve both issues before the worker takes on the new assignment.

Sources

Call us